Corporate Mechanical is working in Lynn, Massachusetts at a Central Heating Facility undergoing major upgrades to the utility infrastructure system that drives their manufacturing campus. The facility expansion is to accommodate three new high-pressure boilers ranging from 1200 to 2200 HP which will generate 220 PSIG of saturated steam. This upgrade effort will support the development of the latest generation of aerospace technology.
The largest boiler seen below is 68′ in length and weighs approximately 125,000 lbs. Corporate Mechanical has removed the existing heating system, installing boilers along with electrical, piping, and plumbing needs. The project also includes the installation of a fire alarm and protection system and rooftop HVAC units.