Location: Boston, MA
Market: Commercial
General Contractor: Wise Construction
Timeline: Spring 2023 – 2024
Services Provided:
- HVAC
- Mechanical
- Fabrication
Project Overview
CMNE recently completed an HVAC core/shell project for a 100,000 sf, nine-story building in Boston. HVAC equipment was furnished and installed along with relevant piping, much of which was fabricated.
The equipment included:
• 9 Air Handler Units (AHUs)
• 1 Glycol Recovery Skid with 4 Air Source Heat Pumps
• 2 Energy Recovery Units (ERVs) with Glycol Recovery Coils
• 9 Pumps (Chilled Water, Hot Water, and Dual Temp Water)
• 2 Boilers