News

Shifting from Heating to Cooling
A spring checklist all facility managers should read for proper HVAC system care.

Corporate Welcomes New HVAC Sales Rep
Corporate Mechanical of New England is pleased to announce that Doug Kinz has joined their team as a Sales Account Representative. Doug will be integral to Corporate’s HVAC Service & Sales team.

Innovation and Design Building, IDB Project
Corporate Mechanical is working with Consigli Construction on a new lab conversion project for the Innovation and Design Building, IDB, located in the Boston Seaport area. The IDB includes three eight-story buildings, 21-25, of which 100,500 sqft of existing office space will be converted into lab facilities.

Upgrades at Harvard’s School of Public Health
The new condenser water loop will replace their old system in the mechanical room. Over 30 environmental rooms have been upgraded with new equipment and temperature controls.

451D Seaport, Boston
Corporate Mechanical has been working on the HVAC scope of a renovation project for a 27,000 sqft space on the first floor of a 9-story office building. The building is located in Boston's Seaport area and will be the new home for Dewpoint Therapeutics.The project has...

Lab Upgrade at The BEAT
The former 7000,000 sqft Boston Globe building located in Dorchester, MA, will be the new home to The BEAT. A modern office, lab, and retail space being developed to stimulate growth in the robotics, life sciences, and high-tech manufacturing fields. Corporate...

WIC Week 2021 Celebration – Deborah
Deborah has been with Corporate since 2019 and is a second-generation pipefitter.

Mass Maritime, MMA Student Joins Corporate for Internship
Kayley, in her Mass Maritime “classroom blacks” uniform, required attire for all cadets during academic classes. Russ Corr, Foreman for Corporate, shows Kayley a section of the recently completed biotech core and shell project in Cambridge, MA. Mass Maritime, MMA...
New Mechanical Systems for Tenant
At 281 Albany Street in Cambridge, Massachusetts, a 32,000 sqft, two-story building has been completely gutted and new mechanical / HVAC equipment and systems are being installed including – AHU’s, rooftop chillers, boilers, water pumps, VFD’s, and all related duct...

MIT’s Lab Space Renovation Project
Corporate Mechanical continues to work on a renovation project for MIT's Building 4 lab space for the Earth, Atmospheric & Planetary Sciences. Extensive piping is being installed. The photos on the upper and lower left show VAV reheat coils that blow hot air...