Upgrades at Harvard’s School of Public Health

Condenser Water Loop The condenser water loop project upgrade consists of two chilled water pumps, two condenser water pumps, one air separator, an expansion tank, three Alfa Laval heat exchangers, and all related piping. Hot taps are required to tie into the existing...

451D Seaport, Boston

Corporate Mechanical has been working on the HVAC scope of a renovation project for a 27,000 sqft space on the first floor of a 9-story office building. The building is located in Boston’s Seaport area and will be the new home for Dewpoint Therapeutics.The...

Lab Upgrade at The BEAT

The former 7000,000 sqft Boston Globe building located in Dorchester, MA, will be the new home to The BEAT. A modern office, lab, and retail space being developed to stimulate growth in the robotics, life sciences, and high-tech manufacturing fields. Corporate...

WIC Week 2021 Celebration – Deborah

DEBORAH MULLENJourneyperson, Pipefitter Deborah has been with Corporate since 2019 and is a second-generation pipefitter. She enjoys learning from experienced Foreman on new ways to get a job done. She said, “Working in the trades has helped me build more...